Oil & Gas
2013
To provide feasibility study, detailed design and tender package for procurement and construction of additional outfall as well as repair/ modification of existing outfall line.
The Outfall Pipeline Project involves the feasibility study for constructing an additional outfall pipeline. Besides the feasibility study, the detailed design of the RCC collecting pit, pipeline outfall, structures & related facilities and tie-in system are also included in the scope.
Number of persons (Peak Load)16
Duration (Months)06
Date of Birth: