Quanta > Projects > Dyes & Pigments > Di-Keto Pyrrol Pyrrol Manufacturing Plant

DPP Plant - Ankleshwar, Gujarat, India

Sector of activity

Chemical

Year of Completion

2006

CAPEX

USD 8.5 Million

Project Mandate

Quanta Process Solutions was awarded a contract to provide basic engineering for the facility manufacturing Di- Keto Pyrrol Pyrrol (DPP), offsite storage facility and utility facility.

Project Description

The DPP Plant project involved basic engineering for the facility producing DPP in batch mode.

Services Provided

  • Basic engineering

Number of Equipment

  • There were about 230 number of equipment

The project features

  • Grass-root plant facility
  • Batch operation
  • Capacity : 1.5 ton/batch DPP & 1.2 batches/day
  • Offsite storage facility
  • Utility facility
  • PFD and P&ID Development
  • PDS of distillation column, agitators, vessels, filters, pumps, tanks
  • Basic engineering package

Professional personnel assigned to project

Number of persons (Peak Load)03

Duration (Months)12