REFINERY, OIL & GAS - Khambhat, Gujarat
Sector of activity
Oil & Gas
Year of Completion
2020-21
CAPEX
US$ 18 Million
Project Mandate
To provide EPCM Oil & Gas services for developing a Central Processing Facility & connecting the existing wells to this facility. The total field area is about 56.4 sq. km.
Project Description
The project involves the development of a central processing facility & connecting the existing 7 nos of wells to this facility. Also, provide provision of connecting future wells (11 nos).
Services Provided
- Conceptualization
- Engineering
- Procurement assistance
- Construction Management
- Inspection and Expediting
- Commissioning assistance
The project features
- Grass-root plant facility
- Central Processing Facility capacity to process 6792 BPD of oil
- HP Three Phase Separator Package
- Well Fluid – Crude Oil Interchanger Package, Well Fluid – Hot Oil Interchanger Package
- LP Three phase Separator Package
- Crude Oil Stabilizing Vessel Package
- Knock-out Drum Package
- Drain Vessel Package
- Produced Water Treatment System
- Collector lines
- Line size: 6”, Length: 12 Km
- Design Pressure: 45 kg/cm2g
- Flow rate: 1080 m3/day
- Crude oil export pipeline
- Line size: 6”, Length: 10 Km
- Design Pressure: 104 kg/cm2g
- Flow rate: 1512 m3/day
Professional personnel assigned to project
Number of persons (Peak Load)25
Duration (months)24