Oil & Gas
2015
To design the surface facilities consisting of gas handling, scrubbing, gas conditioning and treatment and auxiliary units for two gas fields (KW#3 & KW#6). The cumulative capacity of the two marginal gas fields is 3 MMSCFD. The facility shall treat natural gas produced from the Kaameshwari gas field, which is part of the Rajasthan Block. The treated gas is sent to the CNG compressor and filling unit. The surface facilities consist of packaged items which are modular and skid mounted so as to be able to transport from one area to another. The facilities are fully automated to operate with minimum operator intervention considering the remoteness of the gas field.
The Kaameshwari surface facilities project involves the conceptual design and FEED to design the surface facilities for two gas fields along with their associated systems to be modular, skid mounted and fully automated.
There were about 28 number of equipment.
Number of persons (Peak Load)14
Duration (months)6