DESIGN OF SURFACE FACILITIES FOR 2 GAS FIELDS IN RAJASTHAN

Home Project Design Of Surface Facilities For 2 Gas Fields In Rajasthan

REFINERY, OIL & GAS - RAJASTHAN, INDIA

Sector of activity

Oil & Gas

Year of completion

2015

Project Mandate

To design the surface facilities consisting of gas handling, scrubbing, gas conditioning and treatment and auxiliary units for two gas fields (KW#3 & KW#6). The cumulative capacity of the two marginal gas fields is 3 MMSCFD. The facility shall treat natural gas produced from the Kaameshwari gas field, which is part of the Rajasthan Block. The treated gas is sent to the CNG compressor and filling unit. The surface facilities consist of packaged items which are modular and skid mounted so as to be able to transport from one area to another. The facilities are fully automated to operate with minimum operator intervention considering the remoteness of the gas field.

Project Description

The Kaameshwari surface facilities project involves the conceptual design and FEED to design the surface facilities for two gas fields along with their associated systems to be modular, skid mounted and fully automated.

THE PROJECT FEATURES

SERVICES PROVIDED

NUMBER OF EQUIPMENT

Professional personnel assigned to project

Number of persons (Peak Load)

There are about 14 persons

Duration
(Months)

Total duration of the project is 6 months